When a Cost is created in Planner 2.0 having currency that does not equal the base org currency, on the D365 Cost form, exchange rate was not locked. This issue has been fixed.
Modified on: Tue, 26 Mar, 2024 at 12:49 PM
When a Cost is created in Planner 2.0 having currency that does not equal the base org currency, on the D365 Cost form, exchange rate was not locked. This issue has been fixed.
Did you find it helpful? Yes No
Send feedback